国产精品一区二区在线观看_国产视频久久久_在线观看成人_亚洲成人一区二区三区_日韩国产精品一区二区三区_久久社区

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> s the solidification of atomic ash too fast? Changxing Baodi provides you with tips!

s the solidification of atomic ash too fast? Changxing Baodi provides you with tips!


 Atomic ash (also known as unsaturated polyester putty) is an indispensable surface filling and repair material in daily industrial fields such as automobile maintenance, furniture manufacturing, and ship repair. It is widely recognized by users for its excellent filling, polishing, adhesion, and rapid curing properties. Changxing Baodi Environmental Protection Technology Co., Ltd., as a professional manufacturer of atomic ash, has always been committed to providing customers with high-quality products and practical solutions. 

Atomic ash is mainly composed of unsaturated polyester resin, fillers (such as talc powder), a small amount of additives, and supporting curing agents. Its core advantages lie in:
1. Strong filling ability: It can effectively fill defects such as dents, sand holes, and welds on substrates such as metal and wood.
2. Fast drying speed: When used in conjunction with a curing agent, it can harden in a short period of time, significantly improving work efficiency.
3. Good polishing performance: After curing, the hardness is moderate and easy to polish flat, providing a good foundation for subsequent spraying.
4. Excellent adhesion: It has good adhesion to substrates such as metal and wood that have been properly treated.
5. High stability: High quality atomic ash has low shrinkage rate and is not easy to crack or fall off.
Today, Changxing Baodi Environmental Protection Technology Co., Ltd., a manufacturer of atomic ash, received a call from a user asking: What should I do if the atomic ash dries too quickly? Let me explain briefly below
The rapid drying of atomic ash can be solved by adjusting the mixing method, controlling the proportion of curing agent, and optimizing the construction environment. The main reasons include excessive curing agent, high ambient temperature, or excessive mixing amount. Targeted measures such as small and multiple mixing, appropriate reduction of curing agent addition ratio (not exceeding the lower limit), and lowering construction temperature need to be taken. ‌‌‌‌
Adjust the allocation method and proportion
Small amount and multiple blending: calculate the single dosage according to the gel time of the putty, so as to avoid too much one-time blending that will lead to curing before use up. It is recommended to control the amount of each blending within 5-10 minutes. ‌‌‌‌
Reasonably control the proportion of curing agent:
Within the recommended curing agent ratio range by the manufacturer (usually 1.5% -3%), reduce the amount added appropriately to slow down the drying speed, but ensure that it is not lower than the minimum ratio requirement to avoid not drying. ‌‌
Attention: Excessive curing agent is one of the main reasons for rapid drying, and it is necessary to strictly follow the instructions for proportioning.
Optimize the construction environment
Temperature control: High temperature will accelerate the solidification of atomic ash. It is recommended to carry out construction in an environment of 15-25 ℃, avoiding direct sunlight or using heating equipment. ‌‌‌‌
Thin scraping treatment: Adopting a layered thin scraping method, with each layer thickness not exceeding 3mm, shortening the single construction time and reducing the risk of rapid local curing. ‌‌
Other auxiliary measures
Choose slow drying products: If the conventional atomic ash drying speed is too fast, it can be replaced with slow drying models or customized products. ‌‌
Pre treatment of board: Ensure that the construction surface is free of oil and water stains, and avoid accelerated drying caused by abnormal reaction between atomic ash and substrate due to pollution.
The atomic ash produced by Changxing Baodi Environmental Protection Technology Co., Ltd. strictly controls the quality of raw materials and production processes to ensure stable and reliable product performance. We understand that every detail in construction is related to the final outcome. If you encounter the problem of rapid solidification of atomic ash, please do not worry and refer to the above suggestions for adjustment. If the problem persists or you have any questions about product selection, please feel free to contact Changxing Baodi's technical service team at any time. We will wholeheartedly provide you with professional technical support and solutions.
Choose Changxing Baodi Atomic Ash for an efficient and reliable surface repair experience!
Kind reminder: Please refer to the product manual of Changxing Baodi Atomic Ash that you are using for specific operations. Please wear protective equipment during construction to ensure safe operation.


Prev:No data!
NextAnalysis of Atomic Ash Shaping Technology

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網安備 33052202000243號?浙ICP備17019658號

主站蜘蛛池模板: 羞羞的视频免费在线观看 | 国产午夜网 | 国产一级在线看 | 韩国一大片a毛片 | 一级免费a| 免费黄色在线 | 成人毛片网| 91成人亚洲| 黄色网址免费在线 | 天天夜夜草 | 舌头伸进添的我好爽高潮网站 | 欧美日韩高清一区二区三区 | 亚洲激情91| 看个毛片| 久久精品日产高清版的功能介绍 | 免费国产一区二区视频 | 欧美国产精品久久 | a一级黄色大片 | 在火车上摸两乳爽的大叫 | 欧美成人精品h版在线观看 在线2区 | 中文字幕四区 | 毛片在线视频免费观看 | 黄色片网站在线看 | 草b视频在线观看 | 91久久久久久久久久久久久久 | 免费黄色在线观看网站 | 久久久久久久不卡 | 成人免费区 | 国产一精品久久99无吗一高潮 | 久久黄色影院 | 欧美1区2区在线观看 | 精品一区二区久久久久久久网精 | 欧美a级大胆视频 | a视频在线看 | 久久国产精品久久精品国产演员表 | 成人羞羞视频在线观看 | 欧美成人精品欧美一级乱黄 | 深夜福利视频免费观看 | 午夜视频大全 | 一区二区精品在线 | 日韩欧美色综合 |